AI NOTICE

Find The Right Recycling Process For Your Material

How MAS Selects A Plastic Recycling Process

MAS first defines the input condition, current bottleneck and required output. The team then compares the simplest suitable process, an integrated route and—where an installed line exists—a retrofit option. Representative-material trials, operating data, acceptance criteria and project economics are used to confirm the final process sequence before equipment configuration.

Choose The Process Problem To Solve

Select the problem you need to solve. Each route page should compare alternatives, state limitations and explain what data or testing confirms suitability.

Material Testing

Is the material, route or output requirement still uncertain?

Dry Cleaning

Are loose moisture, dust, sand, soil, fines or heavy particles present before extrusion?

Pre-Densification

Is low bulk density causing unstable feeding or throughput?

Twin-Screw Extrusion

Are controlled melting, mixing, homogenisation or degassing required?

Melt Filtration

Are solid contaminants limiting melt or pellet quality?

Re-Compounding

Must recycled-material properties be restored or modified?

PET Processing

Are IV, AA, decontamination or food-contact targets relevant?

Line Upgrades

Is a known bottleneck limiting an existing line?

Automation

Are monitoring, repeatability, documentation or operator-control gaps limiting production?

Which Plastic Recycling Process Do You Need?

Use this comparison to match the process problem to the most relevant MAS technology. Final configuration should be confirmed with material data and, where necessary, a test run.

Process ProblemQuestions To ConfirmFeasible Routes To Evaluate
Validate the routeWhich material behaviour or output is uncertain, and what must be measured?Technical Test Center
Clean before extrusionIs contamination loose or embedded; dry or wet; light or heavy?DRD Dry Cleaner
Stabilize lightweight feedstockWhat bulk density, form, moisture and feeding instability apply?PreDensifier
Melt, mix and degas recyclateWhat mixing, homogenisation, residence-time and volatile-removal targets apply?MAS Twin-Screw Extruders
Remove contaminants from meltWhat contaminant type, size, load and pressure variation occur?CDF Melt Filters
Modify recycled materialWhich properties must be restored or added, and which additives/fillers are required?Re-Compound / Twin Compound
Process PETWhat are starting IV, AA, moisture, contamination and application requirements?HyperPET
Improve an existing lineWhich measured bottleneck limits output, quality or reliability?Upgrade Lines
Improve process controlWhich values, alarms, recipes, records and interfaces are required?Automation and Digitalisation

Material Testing and Process Validation

Testing reduces technical and financial uncertainty.

Main Questions

  • What does the input do under real feeding, heating, filtering and degassing conditions?

Honest Route

A test is useful only when the sample and target are representative.

Dry Cleaning Before Extrusion

Use dry cleaning for the contamination it can actually remove.

Main Questions

  • Contamination type, load, moisture, water use and downstream requirements.

Honest Route

DRD Dry Cleaning may replace part of wet washing, but not every wet-washing duty.

Pre-Densification for Film

Choose preparation by feeding behavior and material stress.

Main Questions

  • Bulk density, kg/h, moisture, temperature, stability and maintenance.

Honest Route

Compare PreDensifier with cutter compactor and no densifier.

Conical Twin-Screw Extrusion for Plastic Recycling

Use twin-screw where mixing and process control create value.

Main Questions

  • Input variation, homogenization, degassing, melt temperature and additives.

Honest Route

Clean homogeneous simple regranulation may suit single-screw.

Melt Filtration for Contaminated Recyclate

Select filtration from contamination load and quality target.

Main Questions

  • Type, load, fineness, pressure development, melt loss and maintenance.

Honest Route

Improve cleaning upstream when filtration alone cannot solve the input.

Re-Compounding and Recycled Polymer Modification

Add complexity only when it upgrades material value.

Main Questions

  • Recipe, additives, filler %, dosing accuracy, mixing and pellet application.

Honest Route

Simple regranulation does not require a re-compounding line.

PET Recycling and HyperPET

Choose the PET route by output specification.

Main Questions

  • IV, AA, color, food-contact, SSP duty, kg/h and energy.

Honest Route

HyperPET for advanced duty; simpler route for simpler target.

Recycling Line Upgrades and Retrofits

An existing extrusion line can be upgraded when melt quality, filtration, degassing or throughput limits production.

Main Process Requirements

  • Add filtration without replacing the complete line
  • Improve degassing and melt cleanliness
  • Adapt the retrofit to the installed equipment

Recommended MAS Route

MAS Upgrade Lines integrate CDF Melt Filtration, cascade extrusion and project engineering into existing recycling systems.

Automation and Digitalisation in Recycling Lines

Automation supports stable operation when feedstock quality, process loads or operator requirements vary.

Main Process Requirements

  • Monitor process conditions and production data
  • Improve repeatability across changing material streams
  • Support operator control and troubleshooting

Recommended MAS Route

Automation and digitalisation connect monitoring and control across preparation, extrusion, filtration, compounding, PET processing and line upgrades.

HyperPET


Evaluate for PET projects with justified IV-development, decontamination or defined food-contact targets; compare with extrusion-only and other SSP arrangements

PreDensifier


Evaluate when low-bulk-density material needs integrated preparation and controlled feeding; compare with cutter-compactor and other preparation routes.

Regrind


Evaluate when regranulation must be combined with filtration, degassing, additive dosing or re-compounding; compare with simple regranulation and separate stages.

Validate the Process Route Before Line Configuration

Confirm why each stage exists and what measurable result it must deliver.

Validation PointDecision Supported
Material form / feedingPreparation route
Cleaning requirementDry vs wet / combined route
Melt and filtrationExtrusion and filter route
Required outputCompounding / PET / pellet route
EconomicsFinal process sequence

Plan The Right Plastic Recycling Process With MAS

Send representative material and describe the current process problem, installed equipment, contamination, moisture, feeding behaviour, required throughput, target application and output quality. MAS will compare feasible routes, identify limitations, define whether trials are needed and agree the measurements and acceptance criteria for the next decision.

  • Material or polymer group
  • Contamination, moisture and bulk density
  • Required throughput and operating conditions
  • Current equipment or planned new line
  • Required pellet, re-compound or rPET quality

Explore Recycling Solutions by Material or Industry

Start from PET, film, rigid plastics, regrind, contaminated plastics or fibers.

Start from the recycling business and application context.

Frequently Asked Questions